Practical Schedule Risk Analysis

Sprache DeutschDeutsch
Buch Broschur
Verlag Taylor & Francis Ltd, Juni 2024
Project scheduling is required for good project management, and the schedule represents the project... Vollständige Beschreibung
? points 146 b
59.69 inkl. MwSt.
50% Chance Wir werden die ganze Welt durchsuchen Wann bekomme ich das Buch?

30 Tage für die Rückgabe der Ware


Kunden kauften auch


How to Strengthen Your Walk with God Barbara Ann King / Buch Broschur
common.buy 14.69
5 Seras Gabriel Briggs / Buch Broschur
common.buy 12.59
Legacy - Dawn Rukis / Buch Broschur
common.buy 20.99
Studio SOS Book Paul White / E-Book Adobe ePub DRM
common.buy 57.79
Big Fix Rob Childs / E-Book Adobe ePub DRM
common.buy 10.29

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project''s schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path''s completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

Schauspielerin & Polyglotte
EWA KASP für
Video abspielen
Ewa Kasp
Libristo bietet die größte Auswahl an fremdsprachiger Literatur an. Deshalb kaufe ich meine Bücher hier ein.
Verschenken Sie dieses Buch noch heute
Es ist ganz einfach
1 Legen Sie das Buch in Ihren Warenkorb und wählen Sie den Versand als Geschenk 2 Wir schicken Ihnen umgehend einen Gutschein 3 Das Buch wird an die Adresse des beschenkten Empfängers geliefert

Das könnte Sie auch interessieren


Die Rechtsbehelfe im Verwaltungsvollstreckungsverfahren. Hans-Dietrich Traulsen / Buch Broschur
common.buy 69.90

Anmeldung

Melden Sie sich bei Ihrem Konto an. Sie haben noch kein Libristo-Konto? Erstellen Sie es jetzt!

 
obligatorisch
obligatorisch

Sie haben kein Konto? Nutzen Sie die Vorteile eines Libristo-Kontos!

Mit einem Libristo-Konto haben Sie alles unter Kontrolle.

Erstellen Sie ein Libristo-Konto
Buchberater Libroamiko
Hallo, ich bin Libroamiko, kann ich helfen?